Projects >> Tulsi Heights >> Floor Plan :: Location Plan

 

 

PLOT No. 1, SEC - 5, NEW PANVEL (EAST). 

:: Amenities ::  

Door : Main door with Wooden Frame. Marble frame for kitchen, bathroom & toilet. Main doors with lamination, Brass fittings and night latch. Bedroom flush door with lamination, Tubular lock, FRP bathroom door.

Windows : Aluminum powder coated sliding windows with granite sill.

Entrance : Decorative entrance lobby.

Lifts : Two Schindler lifts.

Flooring and tilling : Flooring with joint less top glass ceramic tiles. Bathroom flooring with ceramic tiles & wall with glazed tiles Up to door seal level.

Kitchen : Granite platform with stainless steel sink. Full glazed tiles above platform up to loft.

Electrical : Concealed copper wiring with T. V. & Telephone point in living and master bedroom.

Plumbing : Concealed plumbing with hot  and cold water mixer.

Paint : Distemper paint in all rooms. External painting with acrylic paint.

Grill : M. S. Grill for all windows.

Parking : Ample car parking space.

Special feature : Intercom facility in each flat connected with security & society office.

Location Plan

Typical Floor Plan (2nd - 14th)

Site Designed and Developed by CnEL